LED Octopus Necklace
LED Octopus Necklace
$25.00
The LED Octopus Necklace is handmade out of polymer clay, an antiqued octopus charm, leather strap and lobster claw clasp. The necklace hangs at 11” and features an on/off switch on the back. Each necklace includes one 2032 battery. Please keep away from small children, lithium ion batteries are small and dangerous if ingested.
Color Options:
Color changing - a single LED that slowly rotates through all of the colors of the rainbow
Solid Colors - red, blue, green, orange, or pink
Quantity:



